Notice: You have been identified as a bot, so no internal UID will be assigned to you. If you are a real person messing with your useragent, you should change it back to something normal.
Syntax replied with this 15 years ago, 3 minutes later, 45 minutes after the original post[^][v]#138,422
@138,418 (Not Leo Vegas !gNoGoD5HzQ)
Never .. In my office I do not and cannot have a printer on any hardware. Lots of software I cannot have loaded or in theory even on a flash stick.
Tight contract limitations, yet considering what I bill clients, its all ok. On the rare occasions I need say a flight cupon printed out, I just forward it via email to a Fed office at the Airport I will use and just drop on in for a print out.
(Edited 3 minutes later.)
Not Leo Vegas !gNoGoD5HzQ (OP) replied with this 15 years ago, 1 minute later, 47 minutes after the original post[^][v]#138,423
@previous (Syntax)
Mother fucker!!!!!! you should skype. u have my e-mail address if you are lying (lie-ying). skype with me hoss
Not Leo Vegas !gNoGoD5HzQ (OP) double-posted this 15 years ago, 2 minutes later, 50 minutes after the original post[^][v]#138,424
Syntax replied with this 15 years ago, 11 minutes later, 1 hour after the original post[^][v]#138,427
@previous (Leo Vegas !gNoGoD5HzQ)
No need cause I just looked at Tripcode lol
Of course you can have a unique trip for multiple monikers.
Hey when r u planning to? Next launch of the 2nd set of 6 Globalstars are set for launch in July
I am hard nosed bound re SEC rules and can only speak about what is pubic information - So in other words July will be a very busy month for me - I can say I said that a while ago and then the Satellites were pulled from the Russian Rocket and sent back to France and Italy for and for is all I can say for now
"
GLOBALSTAR PREPARES SIX NEW SECOND–GENERATION SATELLITES FOR JULY LAUNCH
Satellites now undergoing pre–launch testing and integration in preparation for launch from the Baikonur Cosmodrome
Covington, LA , June 08 2011- Globalstar, Inc. (NASDAQ:GSAT), a leading provider of mobile satellite voice and data services to businesses, government, and recreational consumers today announced that six new Globalstar satellites are now being prepared for the second launch of the Company's secondgeneration satellite constellation.
Engineers and technicians from launch services provider Arianespace and satellite manufacturer Thales Alenia Space have begun the necessary testing and integration process in preparation for a July liftoff using the highly reliable Soyuz launch vehicle. Later this year Globalstar plans to conduct two additional launches of six satellites per launch also using the Soyuz. In October 2010 the same launch vehicle was used to successfully launch six new Globalstar secondgeneration satellites.
Globalstar signed a contract with Thales Alenia Space in late 2006 for the design, manufacture and delivery of its second–generation constellation satellites. In 2007 Globalstar contracted with Arianespace for a total of four launches of six satellites each using the reliable human–rated Soyuz, which is also used to launch astronauts and cosmonauts to the international space station.
Globalstar plans to integrate the 24 new second-generation satellites with the eight first–generation satellites that were launched in 2007. The new satellites are designed to support Globalstar's current lineup of voice, Duplex and Simplex data products and services including the Company's lineup of SPOT retail consumer products."
Leo Vegas !gNoGoD5HzQ (OP) replied with this 15 years ago, 1 minute later, 1 hour after the original post[^][v]#138,429
@previous (Syntax)
July would most likely be the month that I would (wood) cum (come) to california but it is not set in stone. I have friends/family that are expecting me but i can always adjust the date.
Syntax replied with this 15 years ago, 23 minutes later, 1 hour after the original post[^][v]#138,446
Back during Qualcomm days as manager for first 8 launches I was 100% not available for anything but work and was 95% out of country for.
This go round I R not Manager and now its really just tied up 4 days in advance of launch and then then then ...Dooooon't want to think about the after they are up. Depends on so many factors.
So you and anyone else is free via web 2 C just when the final launch dates are set. Again I R forced to follow those nasty SEC rules re a public corporation as listed on a stock market.
I can say I had to cancel a wedding invite plan with great friends for Sat July 16 and what a shame that is!!!
In other words. Loose Lips Sink Ships lol
Leo Vegas !gNoGoD5HzQ (OP) replied with this 15 years ago, 1 minute later, 1 hour after the original post[^][v]#138,448
@previous (Syntax)
Lol I got you bud. I gues august would be good then
Syntax replied with this 15 years ago, 7 minutes later, 1 hour after the original post[^][v]#138,452
@previous (Leo Vegas !gNoGoD5HzQ)
Yea more better. There is major necessary must have too 2 gots too get the next 6 up ASAP
Once wayyyyyy back when We contracted against my ADVICE and they tried to put up 12 at one time on a Russian Zenit 2 which if one were to look at Wiki re
"In a study of 16 launchers, the Zenit-2 was, as of March 18, 2001, the lowest cost vehicle for achieving LEO in terms of payload weight per launch ($1,167-1,667 per pound or 2,567-3,667 per kg), and one of the lowest in terms of total costs per launch ($35–$50 million)."
Nowhere in article does it bother to say that the 12 we put on the Rocket - Rocket 1st stage fired as expected and 2nd stage DID NOT NOT NOT
Needless to say 12 Satellites instead of LEO's in Orbit at about 1000 miles or so all became GEO's stationary on the GROUND!!!
No more crap shoot with that so called low cost way to go lololol